Capture all option forces all traffic (not only the traffic destined to the subnet of the office of the other end of the VLL tunnel) to go through the remote LAN bonded tunnel. Once capture all option is selected, all traffic is bonded. You can choose to have http downlink traffic to be bonded locally without going through the VLL tunnel by unchecking include http option.